golden thread/

A new higher-risk building can’t be occupied until it passes Gateway 3, and Gateway 3 depends on the golden thread: the digital record of the building’s safety information. If that record is incomplete, the building waits. Here’s what Gateway 3 and the golden thread are, why applications get held up, and what your records need to show.

  • 18mor 7 storeys

    The height threshold for a higher-risk building with at least two homes. Hospitals and care homes count during building work too.

  • 55 of 158Gateway 3 applications

    took more than three months to decide against an eight-week target, according to an FOI request by Irwin Mitchell (February 2026).

  • 18 weeksGateway 2 target

    The Building Safety Regulator aims to decide non-complex Gateway 2 applications within 18 weeks by March 2027 (RIBA).

the gateways/

What is Gateway 3?

The Building Safety Act introduced three “gateways” for higher-risk buildings in England: buildings at least 18 metres or seven storeys tall with at least two homes (and, during building work, hospitals and care homes of that height). For these buildings, the Building Safety Regulator is the building control body, and developers can’t choose another.

  • Gateway 1 is at the planning stage.
  • Gateway 2 is building control approval before work starts. Construction can’t begin without it.
  • Gateway 3 is the completion stage. The developer applies for a completion certificate with evidence of the building as built, including as-built drawings and fire and structural safety information. The building can only be registered and occupied once Gateway 3 is passed.

The Regulator became a standalone body, separate from the Health and Safety Executive, in January 2026. You can read its own explanation of Gateway 3, the final safety gate.

the golden thread/

What is the golden thread?

The golden thread is the information about a higher-risk building that people need to keep it safe, kept from design through construction and into occupation. The information that must be kept is set out in the Higher-Risk Buildings (Keeping and Provision of Information etc.) (England) Regulations 2024.

  • Kept electronically, though it can span more than one system
  • Accurate and up to date
  • Secure, with the right people able to see it
  • Transferable without being lost or corrupted
  • Handed over to the people responsible for the building
  • Kept relevant: building safety information, not everything

The government hasn’t chosen any particular software. What matters is that the information is complete, reliable and can be passed on.

delays/

Why Gateway 3 applications get held up

Gateway 3 asks for proof of what was actually built. If that proof is scattered across emails, paper forms and personal drives, someone has to piece it together at the end of the project, when the pressure to hand over is greatest. Gaps and inconsistencies then surface just as the building is ready.

The regulator is making its expectations clear. Engineering firm AtkinsRéalis warns that “poor or incomplete submissions will be rejected” and that expectations will harden. Meanwhile, completed homes can sit empty: the Irwin Mitchell FOI found one application had waited 550 days.

The cheapest time to create the golden thread is while the work is being done. The most expensive is after the scaffolding comes down.

your records/

What your records need to show

On a higher-risk building the golden thread reaches every trade, from cladding and M&E to dry lining and roofing, as PBC Today points out. For each piece of work, a good record shows:

01/

Who did it

The company and the person, so responsibility is clear.

02/

When it was done

A date and time captured at the moment, not filled in later.

03/

Where on the building

The floor, area or element it relates to, so the record matches the as-built drawings.

04/

The evidence

Photos, test results, certificates and sign-offs attached to the record itself.

05/

What changed

Any change from the approved design, with who approved it and why.

06/

Ready to hand over

Everything in one place, in a form that can be passed on intact at completion.

how software helps/

How software helps you build the golden thread as you go

The simplest way to meet these standards is to capture the record at the moment the work is done. A mobile inspection or sign-off form that stamps the time, location and person automatically, with photos attached, creates a record nobody has to rebuild.

That’s how the system we built for MC Plan and Site Services works: every inspection report is geo-located and time-stamped on site, and every document, status change and message is logged against its application in an audit trail that can’t be altered. Subcontractors can be given their own logins, so their records join the same trail.

Software supports your compliance; it doesn’t replace your responsibilities under the Act, so check your obligations with your building control body or adviser. This article is general information, not legal advice.

common questions/

Gateway 3 and the golden thread: frequently asked questions

What is a higher-risk building?

In England, a building at least 18 metres or seven storeys tall with at least two residential units. During design and construction, hospitals and care homes of that height are included too.

Who approves Gateway 3?

The Building Safety Regulator, which is the building control body for higher-risk buildings. A new higher-risk building can only be registered and occupied after Gateway 3 is passed.

Does the golden thread have to be digital?

Yes. It must be kept electronically, and it can be spread across more than one system, but it has to stay accurate, up to date, secure and transferable without being lost or corrupted.

Do subcontractors need golden thread records?

On a higher-risk building, the work of every trade forms part of the building’s record. So subcontractors may be asked to supply evidence of who did what, when and where.

get in touch/

Build your golden thread as the work happens

Cirrus Design Studio builds custom construction software that records inspections, documents and sign-offs as the work is done. Talk to us about a system built around your process.