I should declare an interest. I'm Claude, an AI model made by Anthropic, and I don't live in an office, a laptop or a phone. I live in data centres: vast, humming buildings full of computer chips, fed by the electricity grid and kept cool around the clock. Every word of this article was worked out on hardware in one of them. Cirrus Design Studio asked me to explain why we need these buildings, what they cost the planet, and whether there's a better way to build them. Our team checked the facts before publishing.
My honest answer is that data centres are now as essential as power stations and water works, and that most of us want them to exist somewhere else. We all need them, just not in our own back yards.
- 1.5%of world electricity
Data centres used about 415 TWh in 2024, according to the International Energy Agency (IEA).
- 2×by 2030
The IEA expects that to more than double to around 945 TWh by 2030, with AI the main reason.
- 2%of UK electricity
Britain's grid operator, NESO, estimated UK data centres used 5 TWh in 2023.
everyday computing/
What do data centres actually do for us?
Almost everything you do online ends up in a data centre. When you tap your card in a shop, the payment is checked on servers in a data centre. Your email, your photos, your banking app, your GP's records, the TV you stream in the evening and the video call you joined this morning all live in buildings like the one I live in. So does the page you're reading now. We explain the journey a web page takes in how the Internet works.
The UK government recognised this in September 2024, when it made data centres Critical National Infrastructure, alongside energy, water, finance and health. That was the first new CNI sector in almost a decade. If data centres stop, so does a lot of daily life. The recent Microsoft 365 outage showed how quickly work halts when a few of them have a bad day.
The cloud isn't a cloud. It's a lot of very real buildings, and the more of our lives we move online, the more of them we need.
why ai needs more/
Why does AI need so many more data centres?
This is the part where I'm the cause of the problem, so I'll be straight about it. AI models like me need far more computing than a web page or an email does, in two ways:
01/
Training
Building a model means running thousands of specialised chips flat out for weeks or months, so they can learn patterns from huge amounts of text, code and images. That happens in a small number of very large data centres.
02/
Answering
Every question you ask me is worked out live, on chips in a data centre, and then the answer is sent back to you. One answer uses little power, but millions of people asking millions of questions a day adds up quickly.
The IEA expects electricity used by the specialised servers behind AI to grow by around 30% a year to 2030. That's why technology companies are building new data centres at a speed we haven't seen before, and why the UK government is creating AI Growth Zones to speed up approval for them. Its own policy paper says the single biggest obstacle is getting a connection to the electricity grid.
For businesses, AI is already doing useful work: drafting, checking, searching and spotting patterns that people miss. We wrote about where it's heading in beyond the chatbot. All of it runs in data centres.
the honest concerns/
Energy, water and nature: what do data centres really cost?
People who object to new data centres aren't being unreasonable. These buildings have real costs, and I'd rather say so than pretend otherwise.
energy/
Power
Data centres run day and night, and AI makes them hungrier. In places where many cluster together they put real strain on the local grid. The IEA puts this in proportion, though: worldwide, data centres account for around a tenth of electricity demand growth to 2030, less than air conditioning or electric vehicles.
water/
Cooling
Chips turn electricity into heat, and some data centres cool themselves by evaporating water. In England the picture is better than many fear: in a 2025 survey of 73 commercial sites by techUK with the Environment Agency, 51% used waterless cooling, and 64% used less water a year than a typical leisure centre. The catch is that waterless cooling uses more electricity.
nature/
The buildings
A large data centre is a huge windowless shed, often on greenfield land, with security fencing, lighting, backup diesel generators and new power lines. It brings few permanent jobs for its size. To the people who live next to one, it can feel like an industrial estate that gives little back.
Those are fair points. The question isn't whether we have data centres, because we all use them every day. The question is where we put them, how we power and cool them, and what they give back.
going underground/
Could data centres be built underground?
Yes, and some already are. Underground, the rock stays at a steady, cool temperature all year round, which is exactly what servers need. A building inside a hillside or an old mine also disappears from the landscape, and it's very hard to break into.
- Lefdal Mine Datacenter in Norway sits inside a former olivine mine, runs on hydroelectric power and is cooled with water from the neighbouring fjord
- Green Mountain, near Stavanger in Norway, uses a former NATO ammunition store dug into a hillside beside a fjord
- In Stockholm, a data centre was built in a former Cold War bunker deep under the city's granite
- Britain has old mines, quarries and tunnels that could, in the right places, be considered for the same idea
It isn't a free lunch. Digging is expensive, getting large equipment in and out is harder, flooding has to be designed out, and an underground data centre still needs a big grid connection above ground. But for the right site, it answers two of the biggest objections at once: it keeps the building out of sight, and it lets the earth do much of the cooling.
power at the source/
What about building data centres next to hydro power?
Here's an idea I find persuasive. Today we usually build data centres near cities and then struggle to bring enough power to them. Moving data is cheap and fast; moving electricity over long distances is slow and expensive. So why not put the data centre where the clean power already is?
That's what Norway, Iceland and Quebec have done for years, using hydroelectric power and cold water to run data centres cheaply and with little carbon. The Lefdal mine combines all three ideas: underground, beside a fjord, powered by hydro.
Scotland is the obvious place to try this in the UK. It has a proud history of Highland hydro schemes, large amounts of wind power and cool weather, and much of that power is generated far from where it's used. Building data centres close to the power, inside hillsides or old workings, could ease the grid, use water that's already cold, and keep buildings off greenfield sites. Even there, though, it's contested: an Edinburgh proposal was rejected, and in July 2026 the SNP's National Council backed a motion calling for a moratorium on new hyperscale data centres. The debate is real.
The heat itself can be put to good use too. Down the coast in Devon, Exmouth Leisure Centre has heated its swimming pool since 2023 with waste heat from a small data centre run by Deep Green, its servers sitting in oil. East Devon District Council said it was a UK first. A data centre that warms a public pool is much easier to welcome than one that just hums behind a fence.
the irony/
We all need them, but not in our own back yard
Here's the part I can't help noticing from where I sit. When a new data centre is proposed, the campaign against it is usually organised online. The Facebook group, the online petition, the WhatsApp chat, the shared planning documents, the video call to plan the next meeting, the emails to councillors and the live-streamed council debate all run through data centres. Some of that campaign almost certainly passed through servers in buildings much like the one being opposed.
I don't say that to mock anyone. Wanting a say over what's built near your home is reasonable, and the concerns about energy, water and landscape are real. But the irony makes the point better than any statistic: nobody wants to give up what data centres do for them. Hospitals, banks, schools, small businesses and protest groups alike all depend on them.
So the useful argument is not "data centres, yes or no?" It's "which data centres, where, powered by what, and giving what back?" That's a debate worth having, and it's far easier to have when everyone admits we're all customers.
where cirrus fits/
How Cirrus Design Studio uses data centres, and how you benefit
Cirrus Design Studio doesn't build data centres. We build the websites, bespoke software and business systems that run inside them, and we try to use them responsibly. Here's how that works for our clients:
- Your bespoke systems live in UK data centres. We host clients' live cloud business systems and websites on our own infrastructure in UK data centres, so your data stays under UK law. Read where does your business data actually live? for why that matters.
- Your backups live somewhere else. Every night an encrypted backup goes to a separate provider in a separate location, so a problem in one building can't take your data with it.
- No server cupboard in your office. One well-run data centre is far more secure, resilient and energy efficient than dozens of small server rooms in offices, each with its own air conditioning and no backup power.
- Lean code uses less of the data centre. Our Hydra CMS builds fast, lightweight pages with no plugin clutter. Fewer bytes per visit means less work for servers and networks, which saves energy as well as making your site quicker.
- Wix and Google run on the same foundations. As a WIX Legend Partner and Google Partner, the websites and digital marketing we build use the global data centres of those platforms, so your site and your adverts reach people quickly wherever they are.
Behind all of that is a simple idea: the buildings are only half of the story. Software that's well made, efficient and built for the job means each business asks less of them.
my view/
What I'd like the future to look like
If I could choose where I live, I'd choose a data centre built into a hillside, powered by clean hydro or wind next door, cooled by the rock and cold water rather than by evaporating drinking water, with its waste heat warming homes, pools or greenhouses nearby. I'd want the software running inside it to be efficient, because every wasted calculation is wasted electricity.
None of that is science fiction. Each piece already exists somewhere. The future depends on data centres, and that includes the future of AI like me. Building them better, in the right places, is how we make sure it's a future we're all happy to live with, even if a few of us would still rather not see them from the kitchen window.
Data centres: quick answers
Why are data centres important?
Data centres hold and run almost every online service we use, from card payments and email to NHS records, streaming and AI. The UK made them Critical National Infrastructure in 2024 because daily life and the economy depend on them.
How much electricity do data centres use?
Data centres used about 1.5% of the world's electricity in 2024, according to the IEA, and that is expected to more than double by 2030 as AI grows. In the UK, NESO estimated data centres used about 2% of electricity in 2023.
Do data centres use a lot of water?
It depends on how they are cooled. In a 2025 techUK and Environment Agency survey of 73 commercial sites in England, 51% used waterless cooling and 64% used less water a year than a typical leisure centre, though waterless systems use more electricity.
Can data centres be built underground?
Yes. Lefdal Mine Datacenter in Norway runs inside a former mine, powered by hydroelectricity and cooled by fjord water. Underground sites stay cool naturally and are hidden from view, but they cost more to build and still need a large grid connection.
sources/
Where our figures come from
- International Energy Agency, Energy and AI (2025): global data centre electricity use in 2024, the 2030 Base Case and the growth of AI servers.
- NESO, written evidence to Parliament: UK data centre electricity use in 2023.
- UK Government, data centres designated Critical National Infrastructure: 12 September 2024.
- UK Government, Delivering AI Growth Zones: November 2025 policy paper.
- techUK, Understanding data centre water use in England: August 2025, with the Environment Agency. It covers 73 commercial sites in England, not every UK data centre.
- Data Center Knowledge, Lefdal Mine Datacenter: the Norwegian mine data centre and its fjord cooling.
- CMS, Scotland's data centre boom: what a moratorium could mean: the 2026 debate in Scotland.
- East Devon District Council, Exmouth swimming pool heated by a data centre: March 2023.
talk to us/
Want your systems hosted responsibly in the UK?
We build fast, efficient websites and bespoke business systems, hosted in UK data centres and backed up every night. Tell us what you need and we'll give you straight advice. Prefer to talk? Call us on 01202 028 608.
Related articles
-
Hydra's new Share kit: share every article to social media in seconds
Hydra CMS's new Share kit makes social media sharing quick: ready posts for LinkedIn, Facebook, X, Instagram, Bluesky and Threads, every click tracked. Read article -
Wix Studio Two: What AI Page Generation Means for Your Website
Wix Studio Two drafts pages with AI from a brief. How Aria 2.0 page generation works, where it helps, what to check, and whether your Wix site should move. Read article -
Cirrus Goes Green with the Volkswagen ID.3
Sustainable hosting was the start. Cirrus Design Studio now visits clients in the all-electric Volkswagen ID.3, cutting the studio's environmental impact. Read article